The City of Montigny-lès-Cormeilles (95) has taken a proactive approach to modernising the energy performance of its building portfolio. Its estate totals 51,600 m² across 33 buildings with a variety of uses (schools, town hall, community centres, sports complexes, association and cultural buildings, etc.), managed by a single maintenance contractor. Faced with non-compliance with the BACS and Tertiary Decrees, the local authority wanted to acquire a smart energy management system to improve the overall performance of its buildings.

 

-20
%
CO₂
51 600m
2

Challenges

The local authority faced several major issues:

  • Regulatory non-compliance (BACS and Tertiary Decrees)
  • Overconsumption due to performance drift not detected early
  • Scattered and unreliable energy data
  • Budget constraints requiring a financed solution
  • The need to work closely with the incumbent maintenance contractor
  • A wish to retain full ownership of its energy data

Solutions and objectives

Accenta deployed a tailored smart control solution to meet these challenges:

  •  Installation of a class B BMS in the 13 most energy-intensive buildings
  •  Deployment of hypervision software to monitor consumption across the entire portfolio from a centralised platform
  •  Implementation of smart alerts for the maintenance contractor to quickly identify malfunctions
  •  Regular digital inspection rounds carried out by Accenta’s Energy Manager teams, in addition to the maintenance contractor’s interventions
  •  Secure contractual arrangement, via an 8-year co-contracting agreement with ENGIE Solutions, ensuring lasting alignment between all stakeholders
  •  Full financing of the project by Accenta, for implementation with no impact on the local authority’s budget

Expected results:

  •  Compliance with regulatory obligations (BACS Decree),
  •  A measured reduction in energy consumption and CO₂ emissions ranging from 13% to 34% depending on the building,
  •  Long-term improvement in comfort, responsiveness and energy performance.

Discover other Eren Building projects

  • AI-DRIVEN CONTROL AND OPTIMISATION

    City of Roubaix

    For environmental and economic reasons, the City of Roubaix called on Accenta with the aim of reducing the energy consumption of its building portfolio.

  • LOW-CARBON HEATING AND COOLING

    École Polytechnique in Palaiseau

    The engineering school chose borehole geothermal energy to provide heating and hot water to its 4-building campus residence. The gas boiler was completely replaced, installed without disrupting campus life, cutting the energy bill by 60%.

  • LOW-CARBON HEATING AND COOLING

    Port of La Rochelle

    With its ambition to cut carbon emissions by 30% by 2030, collaboration between waste heat producers and consumers represents a real opportunity for the La Rochelle area.

    The La Rochelle Energy-from-Waste plant (UVE) is a treatment centre for waste from local authorities and industry.

AI-DRIVEN CONTROL AND OPTIMISATION

City of Roubaix

For environmental and economic reasons, the City of Roubaix called on Accenta with the aim of reducing the energy consumption of its building portfolio.

LOW-CARBON HEATING AND COOLING

École Polytechnique in Palaiseau

The engineering school chose borehole geothermal energy to provide heating and hot water to its 4-building campus residence. The gas boiler was completely replaced, installed without disrupting campus life, cutting the energy bill by 60%.

LOW-CARBON HEATING AND COOLING

Port of La Rochelle

With its ambition to cut carbon emissions by 30% by 2030, collaboration between waste heat producers and consumers represents a real opportunity for the La Rochelle area.

The La Rochelle Energy-from-Waste plant (UVE) is a treatment centre for waste from local authorities and industry.