Our approach

Your challenges

Operating budgets

under constant pressure.

Non-negotiable

air quality and thermal comfort requirements.

Energy renovation

growing decarbonisation and environmental reporting requirements.

Testimonial

“This project embodies our commitment to bringing this institution of excellence a new technology to test an unprecedented and sustainable energy mix, combining geothermal energy, solar energy and smart control. We are proud to support École Polytechnique on an exemplary path towards carbon neutrality.”

Fabrice Didier,

CEO of Accenta

Our projects

  • LOW-CARBON HEATING AND COOLING

    École Polytechnique in Palaiseau

    The engineering school chose borehole geothermal energy to provide heating and hot water to its 4-building campus residence. The gas boiler was completely replaced, installed without disrupting campus life, cutting the energy bill by 60%.

  • AI-DRIVEN CONTROL AND OPTIMISATION

    Emeis – 3 healthcare facilities

    17,000 m² of clinics and care homes (Andilly, Paris 16, Boulogne-Billancourt) managed on a single platform. Unified BMS, dynamic AI, air-source heat pump — all financed by the savings generated through an Energy Performance Contract (EPC), IPMVP protocol, without committing any of Emeis’s CAPEX.

  • AI-DRIVEN CONTROL AND OPTIMISATION

    Nicolas de Peiresc Hospital

    Construction of a new building of around 11,000 m2 housing hospital departments (dialysis / nephrology, gastroenterology, geriatrics, diabetology, neurology, endocrinology, neurology, cardiology, pulmonology).

LOW-CARBON HEATING AND COOLING

École Polytechnique in Palaiseau

The engineering school chose borehole geothermal energy to provide heating and hot water to its 4-building campus residence. The gas boiler was completely replaced, installed without disrupting campus life, cutting the energy bill by 60%.

AI-DRIVEN CONTROL AND OPTIMISATION

Emeis – 3 healthcare facilities

17,000 m² of clinics and care homes (Andilly, Paris 16, Boulogne-Billancourt) managed on a single platform. Unified BMS, dynamic AI, air-source heat pump — all financed by the savings generated through an Energy Performance Contract (EPC), IPMVP protocol, without committing any of Emeis’s CAPEX.

AI-DRIVEN CONTROL AND OPTIMISATION

Nicolas de Peiresc Hospital

Construction of a new building of around 11,000 m2 housing hospital departments (dialysis / nephrology, gastroenterology, geriatrics, diabetology, neurology, endocrinology, neurology, cardiology, pulmonology).

contact

Request a decarbonisation assessment