City of Montigny-lès-Cormeilles
The City of Montigny-lès-Cormeilles (95) has taken a proactive approach to modernising the energy performance of its building portfolio.
Projects
Management of the building portfolio.
Swimming pool, stadiums, sports halls, schools
Background
For environmental and economic reasons, the City of Roubaix called on Accenta with the aim of reducing the energy consumption of its building portfolio. To do so, Accenta proposed to closely monitor energy consumption and to control the HVAC equipment, since it accounts for a significant share of the city’s spending.
The City of Roubaix plans to deploy a solution by adding buildings progressively. It therefore needs to bring together the data from its buildings on one single platform. The solution must also be compatible with working with different maintenance contractors.
The City of Roubaix chose Accenta’s smart control solution. This infrastructure is being deployed according to the city’s schedule and building by building, and enables optimised control of all HVAC equipment.
On the technical side, the main components installed are as follows:
This equipment is connected to the following platforms, provided to the maintenance contractors:
This artificial intelligence software controls the HVAC equipment in each building in real time, based on analysis of consumption and ambient indicators (temperature, humidity, light levels, weather, etc.) measured in the different functional zones.
An Energy Management service also advises the maintenance contractors to achieve maximum energy performance.
Networking these elements across the city’s entire building portfolio creates a single, centralised and smart system.
The Smart BMS installed by Accenta offers several benefits for the city and its residents:
The City of Montigny-lès-Cormeilles (95) has taken a proactive approach to modernising the energy performance of its building portfolio.
The SEA GREEN group is committed to managing and reducing its consumption and improving its energy performance, by implementing an energy management system across all its campsites.
Construction of a new building of around 11,000 m2 housing hospital departments (dialysis / nephrology, gastroenterology, geriatrics, diabetology, neurology, endocrinology, neurology, cardiology, pulmonology).