Projects

Anonymous colocation data centre

An ultra-compact data centre that breaks energy efficiency records.

-60
%
energy savings

Data Centre

Recirculating indirect evaporative cooling with 129-tonne DX for trim cooling.

Background

This project is one of Air2O’s flagship projects, in Air2O’s SMR product category. This integrated solution, with a capacity of up to 422 kW, includes a water-side economiser/circulation coil and an economiser/DX trim. The project delivered a high-quality, cost-effective solution for a colocation data centre project in North America.

 

 

464,5m
2
100
%
Recirculated air

The challenge

One of the world’s leading digital infrastructure providers needed a cooling solution to replace its existing data centre units with a more efficient one, in order to reduce operating costs and allow system upgrades; it had to be designed within dimensional and weight constraints, with an unprecedented footprint-to-capacity ratio.

The project’s design team was looking for an energy-efficient cooling solution that would keep upfront costs under control while ensuring optimal comfort with minimal energy consumption, to avoid high operating costs, while taking all the constraints into account. Given the scale of the project, the client questioned whether solutions available on the market could meet its requirements ; standard solutions were therefore not an option.

Main results

  • PUE of 1.05
  • 60% energy savings
  • 100% recycled air
  • Sustainable solution
  • Environmentally friendly

The approach

Traditional air handling units using refrigerant or chilled water were considered, but their high energy consumption is further increased by the heat given off by IT servers and other equipment. After reviewing all the project’s requirements and constraints, the design team opted for SMR units, which use hybrid operation (indirect evaporative cooling and mechanical cooling) to achieve high efficiency and cooling capacity. In addition, developing a highly efficient sequence of operation proved necessary to guarantee smooth, economical operation, which led the design team to develop and implement a new energy management protocol to reduce operating costs.

The solution

The final choice was 5 No.SMR-600 indirect evaporative cooling units of 69,800 CFM with direct expansion (DX) to maintain a supply temperature of 21 °C (70 °F) for several years. These units meet the footprint and weight constraints. An integrated control system, optimising unit operation according to variations in load and ambient temperature, was implemented. The result is an unprecedented, industry-leading cooling capacity of 5 MW over an area of 465 m² (5,000 sq ft).

Discover other Eren Building projects

  • AI-DRIVEN CONTROL AND OPTIMISATION

    City of Roubaix

    For environmental and economic reasons, the City of Roubaix called on Accenta with the aim of reducing the energy consumption of its building portfolio.

  • LOW-CARBON HEATING AND COOLING

    Icade Porte de Paris

    The Icade group, one of France’s leading commercial property companies, planned to reduce energy consumption and improve the carbon footprint of its Parc des Portes de Paris.

     

  • AI-DRIVEN CONTROL AND OPTIMISATION

    Union Investment buildings

    163,000 m² of offices optimised simultaneously through smart control. Centralised energy reporting, compliance with the French Tertiary Decree and BACS Decree ensured without a single worksite and without disrupting operations.

AI-DRIVEN CONTROL AND OPTIMISATION

City of Roubaix

For environmental and economic reasons, the City of Roubaix called on Accenta with the aim of reducing the energy consumption of its building portfolio.

LOW-CARBON HEATING AND COOLING

Icade Porte de Paris

The Icade group, one of France’s leading commercial property companies, planned to reduce energy consumption and improve the carbon footprint of its Parc des Portes de Paris.

 

AI-DRIVEN CONTROL AND OPTIMISATION

Union Investment buildings

163,000 m² of offices optimised simultaneously through smart control. Centralised energy reporting, compliance with the French Tertiary Decree and BACS Decree ensured without a single worksite and without disrupting operations.

Contact

Assess your project’s potential free of charge