Camping Les Grenettes
The SEA GREEN group is committed to managing and reducing its consumption and improving its energy performance, by implementing an energy management system across all its campsites.
Projects
The centre chose geothermal energy to supply its courts, swimming pools and hotel, cutting its energy bill by 74% and achieving ROI within 7 years.
Background
The Mouratoglou Tennis Academy called on Accenta to deliver on its environmental ambitions.
The assignment was to equip the 600 m² of offices and 12,000 m² of hotel space with a clean and cost-effective heating and cooling production system.
The resort chose to install a geothermal-based heating and cooling production system made up as follows:
For the administrative building
For the hotel
The SEA GREEN group is committed to managing and reducing its consumption and improving its energy performance, by implementing an energy management system across all its campsites.
World’s first industrial thermal battery commissioned (Sept 2025). Recovery of waste heat from the SETMI energy-from-waste plant (incinerator, 240,000 t/year of waste) transported to the Alex Jany swimming pool and ice rink complex. 2 thermal batteries of 1 MW. Financing: Water Horizon + European Commission (Innovation Fund €2.5M). Stakeholders: Toulouse Métropole, SETMI, European Commission.
The Wonder Building is a large-scale project converting a former industrial brownfield into a state-of-the-art office building.