Projects

Nicolas de Peiresc Hospital

The hospital under full supervision.

11 000m
2

Aix-en-Provence Hospital (13)

280 beds in 243 rooms, 20 dialysis stations and 2 technical platforms

Background

Esmé Solutions was commissioned to install a Building Management System (BMS) in operational BIM to meet the client’s comfort needs and supervise the technical installations. 480 HVAC
controllers managed by DL-110 modules

480
HVAC controllers managed by DL-110 modules
100
%
BIM

Objectives

Construction of a new building of around 11,000 m² housing hospital departments (dialysis / nephrology, gastroenterology, geriatrics, diabetology, neurology, endocrinology, neurology, cardiology, pulmonology).

Equipment

  • D-One Site Edition supervision
  • Heating, ventilation, cooling: 480 HVAC controllers managed by DL-110 modules (Esmé Solutions)
  • 25 AHUs (air handling units), 13 of them pressurised, managed by Energy Box UC4 control units
  • Variable speed drives for Danfoss AHU ventilation
  • Chilled water production (CARRIER): cascade of chillers and distribution circuits managed by Energy Box UC4 control units
  • Hot water production: generator and distribution circuit managed by Energy Box UC4 control units
  • Wilo circulating pumps
  • Power systems: 185 electricity meters and sub-meters
  • Sensus thermal energy meters

Supervision features
on the BIM model

  • Full BIM project
  • Heating and cooling management via radiant panels, cassettes and fan coil units
  • 3D re-partitioning tool for spaces and equipment
  • Viewing of chilled water and hot water production information
  • Management of air handling units
  • Water leak detection management
  • Metering and dashboards (heat, electrical energy, water)


System operation

  • Communication protocols: LON / BACnet / Modbus

Discover other Eren Building projects

  • AI-DRIVEN CONTROL AND OPTIMISATION

    City of Roubaix

    For environmental and economic reasons, the City of Roubaix called on Accenta with the aim of reducing the energy consumption of its building portfolio.

  • LOW-CARBON HEATING AND COOLING

    Icade Porte de Paris

    The Icade group, one of France’s leading commercial property companies, planned to reduce energy consumption and improve the carbon footprint of its Parc des Portes de Paris.

     

  • AI-DRIVEN CONTROL AND OPTIMISATION

    Emeis – 3 healthcare facilities

    17,000 m² of clinics and care homes (Andilly, Paris 16, Boulogne-Billancourt) managed on a single platform. Unified BMS, dynamic AI, air-source heat pump — all financed by the savings generated through an Energy Performance Contract (EPC), IPMVP protocol, without committing any of Emeis’s CAPEX.

AI-DRIVEN CONTROL AND OPTIMISATION

City of Roubaix

For environmental and economic reasons, the City of Roubaix called on Accenta with the aim of reducing the energy consumption of its building portfolio.

LOW-CARBON HEATING AND COOLING

Icade Porte de Paris

The Icade group, one of France’s leading commercial property companies, planned to reduce energy consumption and improve the carbon footprint of its Parc des Portes de Paris.

 

AI-DRIVEN CONTROL AND OPTIMISATION

Emeis – 3 healthcare facilities

17,000 m² of clinics and care homes (Andilly, Paris 16, Boulogne-Billancourt) managed on a single platform. Unified BMS, dynamic AI, air-source heat pump — all financed by the savings generated through an Energy Performance Contract (EPC), IPMVP protocol, without committing any of Emeis’s CAPEX.

Contact

Assess your project’s potential free of charge