Projects

Eurocommercial’s Centr’Azur

Heating/cooling production – Geothermal energy.

-88
%
CO₂

Shopping centre in Hyères (83)

Groundwater geothermal energy. Replacement of gas boiler + chiller.

Background

As part of its ambitious ESG strategy, Eurocommercial France wanted to eliminate the use of gas at its Centr’Azur site in Hyères and enhance the value of its property asset. The shopping centre, equipped with a gas boiler and dry coolers, needed to find an alternative heating and cooling solution compatible with its decarbonisation objectives.

9 500m
2
3,000 m² of shopping mall and 6,500 m² of retail units
-59
%
energy savings

Challenges

Eurocommercial France’s main challenge was to choose a heating and cooling production solution that would:

  •  Eliminate gas on the site and use a renewable energy source
  •  Reduce operating costs
  •  Enhance the value of the property asset

Solutions and objectives

To meet these challenges, Accenta deployed a geo-storage-based heating and cooling production solution, comprising:

  •  A compact geothermal boiler plant
  •  A geothermal borehole field of 600 linear metres
  •  AI and Energy Manager control of the installation to maximise energy savings
  • Expected benefits:
  •  88% reduction in CO₂ emissions
  •  59% reduction in HVAC consumption
  •  Alignment with the CRREM pathway

Discover other Eren Building projects

  • AI-DRIVEN CONTROL AND OPTIMISATION

    Carrefour shopping centre

    Installation of an Esmé Solutions BMS, taking over the lighting control. Monitoring/control of the HVAC system was added.

  • AI-DRIVEN CONTROL AND OPTIMISATION

    Éole Évangile / Linkcity, Îlot fertile Paris 19th

    The “Ilot Fertile Triangle Eole Evangile” project led by LINKCITY Ile-de-France was named winner of the Reinventing Paris competition and aims to develop Paris’s first Zero Carbon in operation neighbourhood.

  • AI-DRIVEN CONTROL AND OPTIMISATION

    Redevco’s Espace du Palais in Rouen

    As part of its carbon plan to cut its CO₂ emissions by 50% by 2030, Redevco European Ventures Rouen wanted to carry out the energy renovation of its Espace du Palais shopping centre, located in the heart of Rouen, through an energy management solution. The objective: to meet the regulatory requirements of the Tertiary and BACS Decrees while maintaining comfort for users.

     

AI-DRIVEN CONTROL AND OPTIMISATION

Carrefour shopping centre

Installation of an Esmé Solutions BMS, taking over the lighting control. Monitoring/control of the HVAC system was added.

AI-DRIVEN CONTROL AND OPTIMISATION

Éole Évangile / Linkcity, Îlot fertile Paris 19th

The “Ilot Fertile Triangle Eole Evangile” project led by LINKCITY Ile-de-France was named winner of the Reinventing Paris competition and aims to develop Paris’s first Zero Carbon in operation neighbourhood.

AI-DRIVEN CONTROL AND OPTIMISATION

Redevco’s Espace du Palais in Rouen

As part of its carbon plan to cut its CO₂ emissions by 50% by 2030, Redevco European Ventures Rouen wanted to carry out the energy renovation of its Espace du Palais shopping centre, located in the heart of Rouen, through an energy management solution. The objective: to meet the regulatory requirements of the Tertiary and BACS Decrees while maintaining comfort for users.

 

Contact

Assess your project’s potential free of charge